Power for your site. Every route, priced in seconds.
Describe the load. See the grid, behind-the-meter, PPA and firming options together, each with its cost per MWh and its chance of being in place by your date.
CYour power stack · 200MW firm by 2028Example data
What the rules allow in Abu Dhabi, checked before we price anything.
Grid supply: single buyerPrivate PPA: not allowedOn-site gas: approval neededGas supply: state allocation
RouteMWCost basisChance by 2028
Grid supply, 400kVtariff from the single buyer · timing from Connection Tracker peers120tariff64%
Gas engines on siteneeds regulator approval and a gas allocation · 22-month lead time80fuel + capex91%
Fallback: more gas enginesused only if the grid offer slips past Q2 2027+120fuel + capex87% overall
Clean energy certificatesraise the carbon-free claim; not hourlyn/aper MWh99%
58%chance all 200MW are in place by 2028, on plan
87% if the fallback is used: 120MW more gas if the grid offer slips past Q2 2027. Cost: indicative $70 to 85/MWh.
Not offered here: private solar PPA (the grid has one buyer).
Developing a power project?
It is probably already listed here from public registers. Verify it and receive matched requests from data-centre buyers.