Land. I have land or a site.
Choose the question that fits. A person reviews every request.
CSite Check · 64.93, 25.48Example data
78of 100 · strong data-centre site
PowerStrong · 110kV, 3.1km
LandStrong · 62 acres, flat
ControlCheck · private owner
PermittingGood · industrial zoning
Power value€55 to 90k per acre
Grid power by 202971% for 50MW
Buyers nearby4 open requirements
From grid, land, hazard and market data, every figure sourced and dated.
CTime to power · Example parcelExample data
47%chance of 50MW within 3 years
MarketHesse, Germany
50% chance of power byQ2 2028
Queue position14 of 31 at substation
On-site option40MW gas engines, 22 months
All-in cost band€62 to 78/MWh indicative
Timeline50% by Q2 2028
ApplicationStudyWorksEnergise
CConnection Tracker · 50MW at Westfield 132kVExample data
41%chance of power by Q4 2028, up from 36%
Your timeline against similar projects41% by Q4 2028
Applied Sep 2025Study Jun 2026Offer Mar 2027Power
Projects ahead at this substation6, was 8 last month
Similar projects with an offer by now58% of 412 timelines
If the grid slips3 options, see plan B
28 OctTwo projects ahead of you withdrew (public queue update).
21 OctReform deadline: evidence of land rights due by 31 Jan.
12 OctA 30MW project at your substation reached energisation.
CYour power stack · 200MW firm by 2028Example data
What the rules allow in Abu Dhabi, checked before we price anything.
Grid supply: single buyerPrivate PPA: not allowedOn-site gas: approval neededGas supply: state allocation
RouteMWCost basisChance by 2028
Grid supply, 400kVtariff from the single buyer · timing from Connection Tracker peers120tariff64%
Gas engines on siteneeds regulator approval and a gas allocation · 22-month lead time80fuel + capex91%
Fallback: more gas enginesused only if the grid offer slips past Q2 2027+120fuel + capex87% overall
Clean energy certificatesraise the carbon-free claim; not hourlyn/aper MWh99%
58%chance all 200MW are in place by 2028, on plan
87% if the fallback is used: 120MW more gas if the grid offer slips past Q2 2027. Cost: indicative $70 to 85/MWh.
Not offered here: private solar PPA (the grid has one buyer).